电器与能效管理技术 ›› 2021, Vol. 0 ›› Issue (12): 85-89.doi: 10.16628/j.cnki.2095-8188.2021.12.015

• 配网技术与系统 • 上一篇    下一篇

基于移动式发电车低压台区不停电作业关键技术研究

陈超1, 丁一岷2, 金国忠3, 吴湘源2, 包伟峰2, 柏华东4   

  1. 1.国网浙江省平湖供电有限公司, 浙江 平湖 314200
    2.国网浙江省电力有限公司 嘉兴供电公司, 浙江 嘉兴 314000
    3.嘉兴市恒创电力设备有限公司, 浙江 嘉兴 314001
    4.杭申集团 杭州之江开关股份有限公司, 浙江 杭州 311234
  • 收稿日期:2021-08-14 出版日期:2021-12-30 发布日期:2022-01-24
  • 作者简介:陈 超(1980—),男,高级工程师,主要从事配电网运维检修与管理工作。|丁一岷(1972—),男,高级工程师,主要从事高低压电力设备运维检修管理工作。|金国忠(1982—),男,高级工程师,主要从事配电网设备运维检修管理和研究工作。

Research on Key Technology of Uninterrupted Operation Load Without Power Outage in Low Voltage Transformer Area of Mobile Generator

CHEN Chao1, DING Yimin2, JIN Guozhong3, WU Xiangyuan2, BAO Weifeng2, BAI Huadong4   

  1. 1. State Grid Pinghu Power Supply Company,Pinghu 314200,China
    2. State Grid Jiaxing Power Supply Company,Jiaxing 314000,China
    3. Jiaxing Hengchuang Electric Equipment Co.,Ltd.,Jiaxing 314001,China
    4. Hangzhou Zhijiang Swichgear Stock Co.,Ltd.,Hang Shen Holding Group Co.,Ltd.,Hangzhou 311234,China
  • Received:2021-08-14 Online:2021-12-30 Published:2022-01-24

摘要:

首先对0.4 kV应急发电车保供电应用现状进行了描述,对配电网运检过程中造成负荷停电、操作缺陷等进行详细阐述,提出了一种移动式发电车低压台区不停电作业负荷快速切换方法。利用切换开关快速励磁驱动技术,通过DSP高速采样精准预判并网转换动作时机,并网后通过并网时刻瞬时检测及瞬时解列技术,保证负荷在不停电的情况下实现市电与发电机之间平稳过渡。经过实地运行测试,表明了所提方法运行安全、可靠,为配电网运检提供了一种新的解决方案。

关键词: 应急发电车, 不停电作业, 准同期相位预判, 快速并网与解列

Abstract:

This paper describes the application status of 0.4 kV emergency power generator vehicle to ensure the power supply,the load outage and operational defects caused by the operation detection of distribution network are described in detail.A fast switching method of uninterrupted operation load without power outage in lowvoltage transformer area of mobile generator is proposed. It uses high response excitation driving technology of the change-over switch,and through the DSP high-speed sampling to predict the action time of grid connection conversion accurately.After the grid-connection,instantaneous detection at grid-connection time and instantaneous disassembly technology are used to ensure the load in the case of without power outage to achieve a smooth transition between the mains and generators.After the field operation test,it shows that this method is more efficient,safe and reliable for the operation and inspection of distribution network without power outage.

Key words: emergency generator, non-power outage operation, quasi-synchronous phase prediction, fast grid connection and disconnection