LOW VOLTAGE APPARATUS ›› 2020, Vol. 0 ›› Issue (11): 29-34.doi: 10.16628/j.cnki.2095-8188.2020.11.005

• Research & Analysis • Previous Articles     Next Articles

Research and Application of Automatic Planning Algorithm for Collecting Lines of Wind Farms

ZHU Min, HUANG Guoyan, TANG Binwei   

  1. Mingyang Smart Energy Group Limited, Zhongshan 528437, China
  • Received:2020-06-23 Online:2020-11-30 Published:2020-12-14

Abstract:

This paper draws on the idea of artificial design and proposes a multi-dimensional constrained dynamic programming method,which comprehensively considers various practical problems encountered in the algorithm design process,including fast sub-region clustering,feasible path acquisition,and three-dimensional path planning,economical optimal topology of cable current carrying capacity,interaction between sub-areas,multiple reductions in algorithm operation,greatly shortening planning time.And finally,a practical case manual planning and algorithm operation results comparison indicates that the algorithm is fast and effective.

Key words: collecting lines of wind farms, fuzzy clustering, graph theory, min tree, optimal cost

CLC Number: