Simulation and Calculation of Interruption Process of Generator Circuit breakers Synthetic Test

DU Zhaoxin, ZHOU Desheng, ZOU Xiaofeng, FENG Qian   

  1. DU Zhaoxin, ZHOU Desheng, ZOU Xiaofeng, FENG Qian(State Grid Shanghai Municipal Electric Power Company, Shanghai 200437, China
    State Grid Shanghai Municipal Electric Power Company, Shanghai 200437, China
  • Received:2020-12-24 Online:2021-03-30 Published:2021-04-14

Abstract:

The Weil synthetic test circuit for generator circuit breaker breaking test is built in PSCAD/EMTDC,and the simulation calculation is carried out for the TRV conditions of the auxiliary circuit breaker and the tested circuit breaker during the breaking process.The calculation results show that the TRV parameters of the auxiliary circuit breaker are far lower than the TRV reference value specified in the standard,and the TRV parameters of the tested circuit breaker meet the TRV specified in the standard reference value.Furthermore,the simulation results show that the delay time decreases with the increase of inductance,but peak voltage and peak time are basically unchanged.

Key words: generator circuit-breaker, Weil synthetic test circuit, auxiliary circuit-breaker, TRV